News Head
Noticias

Últimas noticias
Manténgase conectado

December 2021


Barcelona, month summary.

We come to the end of a challenging year. This month we will start launching GIMM-PROCS in the production process of parts for LUCID Motors, the luxury electric cars manufacturer. Also PROCS will be installed in a new plant in Langfang (China) and LINCS, our sequencing system, will be integrated with a COBOT in a plant in France. These are only a few of our very interesting projects that started in December.

Three cumulative updates were released, making available to our customers new functionalities and some bug fixes. A few examples are the adaptations of GIMM SCS Control System to meet BMW requirements; or the possibility to Uniquely identify workstations across all plants of a customer.

Many more details about these functionalities and previous ones in the Download Center. We are also very happy to receive you contact requests for more information and details about our products and services.

We wish you all the best for the new year.
Your GIMM Solutions team.
PROCS EMEA-FRANCE-Theillay
Project to add a new line in PROCS for the production traceability of parts for LUCID vehicles.
OEM: LUCID

LINCS / SYNCHRON ASIA-CHINA-Shanghai
Tesla is adding new information to their messages for sequenced orders. This project aims to adapt the plant's sequencing process to manage TESLA's additional data.
OEM: TESLA

LINCS EMEA-FRANCE-Pfastatt
Project to integrate a COBOT (Colaborative Robot) in the sequencing workflow of the plant. Apart from reorganizing the process workflow, LINCS system will be adapted to generate a new picking label that will serve as a validation tool and manual back-up of the COBOT process; the ECS validation process will be also changed to validate racks from the data coming from the COBOT.
OEM: PSA

PROCS EMEA-CZECH REPUBLIC-Mlada Boleslav
Project to extend with new workstations the production control system of parts for BMW. The plant will also implement a new functionality in GIMM to obtain the quantity of a batch from its label barcode.
OEM: BMW

PROCS AMERICA-BRAZIL-Limeira
Project that will add new workstations to the traceability system of parts delivered to CUMMINS factory in Guarulhos.
OEM: CUMMINS

PROCS ASIA-CHINA-Langfang
Implementation of a new traceability and production control system of parts produced for Mercedes.
OEM: MERCEDES

PROCS EMEA-POLAND-Jelcz
Project to implement new workstations on the existing PROCS system for the traceability a production control of parts for BMW X1 model.
OEM: BMW

PROCS EMEA-FRANCE-Diors
Project that will extend with new workstations the existing production control and traceability system of the line producing parts for Hiunday Kia.
OEM: HYUNDAI KIA

PROCS EMEA-SOUTH AFRICA-Cape Town
Project to implement new workstations on the existing PROCS system for the traceability a production control of parts of vehicle models MY21 Ranger.
OEM: FORD

LINCS EMEA-SPAIN-Arevalo
Adaptations on the existing LINCS system to start sequencing parts for new model C43. The changes will include the management of modular parts structure for the transcodification of C43 call-offs as well as modifications in the sequencing process workflow and dashboards.
OEM: PSA

November 2021


Barcelona, month summary.

Sometimes it becomes absolutely clear that GIMM is about Lean, that is, about reducing waste and continuous improvement. Not only because GIMM solutions support manufacturing and delivery processes using Lean tools as Kanban, Andon or Poka Yoke. GIMM also is continually growing with functionality that enables the factories and OEMs to optimize their processes. The use cases released in November are examples of this.

UC1151 - Will implement quality control over the content in SYNCRO96ATP, the forecasted orders file. The objective is to avoid errors during the production process of the sets of parts required on each order.
UC1270 – Enables a new option to print the Sequence label right after the previous Container was checked. This allows to better synchronize the processes in the plant.
UC1289 – New report to show dependencies between incoming materials and workstations.
UC1290 – New option in the container management to create new cargos with the automatic assignation of containers according to two templates defined by the OEM and with the available containers for each type. This new functionality aims to improve the utilization rate of the trucks.

On the deployments’ projects side: A new plant that will sequence parts to PSA Mulhouse, a PROCS implementation to produce parts for Geely Auto Group in Wuhan, and many others challenging and interesting adaptations.

Please stay safe.
Your GIMM Solutions team.
PROCS EMEA-FRANCE-St Meloir
Project to install and configure PROCS for the production control and traceability of parts for vehicle Lotus T131.
OEM: Lotus (Geely Auto Group)

PROCS AMERICA-USA-Spring Hill
Project to enable the reception and further processing in PROCS system of subassembly parts for the production of new final parts.
OEM: PSA

PROCS AMERICA-MEXICO-San Jose Iturbide
Project to add new references and workstations to the existing production and traceability system.
OEM: GM

PROCS EMEA-SOUTH AFRICA-Port Elizabeth
Project to implement a new line and additional workstations and workflow on a existing line.
OEM: FORD

PROCS EMEA-CZECH REPUBLIC-Pisek
Project to implement a new line in the existing PROCS system. The changes will be self-configured by the customer.
OEM: VOLKSWAGEN

PROCS EMEA-CZECH REPUBLIC-Pardubice
Project to add new workstations on the existing line.
OEM: BMW

LINCS AMERICA-USA-Newark
After the migration to MFS Tesla Connector, ASN interface between the plant and TESLA must also be adapted. The modifications affect to ASN fields naming and file structure.
OEM: TESLA

PROCS EMEA-FRANCE-Messei
Project to implement a new line in the existing PROCS system.
OEM: PSA

LINCS EMEA-FRANCE-LANGRES
New project to install LINCS for the delivery in sequence of parts to PSA Mulhouse. The implementation will include two ECS for the quality control of the picking process and of the sequence order in the containers.
OEM: PSA

PROCS EMEA-FRANCE-Diors
Project to implement an new line and to transfer part of the production workflow from other plant.
OEM: STELLANTIS

PROCS EMEA-SOUTH AFRICA-Cape Town
Project for the implementation of a new Customer Label as well as new workstations and and a new production workflow.
OEM: FORD

October 2021


Barcelona, month summary.

In October we have celebrated our cumulative update 100 for gIMM 4.0. It's been hard work of all the Team since 2014 to always achieve the highest levels of quality and Customer satisfaction. CU100 brings 7 new functionalities, including improvements in PROCS workstations as new printing options, or the securization of finished goods against unwanted recovery, one new components screen for PROCs WebStation and a new option for barcode’s reading in WebPicking. All the details and downloads are available for our customers at the https://gimmsolutions.com/en/scm-mes-software/customer-portal"> Customer Area .

Several OEM’s new requirements have arrived this month and will be developed and implemented during the following weeks in some of our Customer’s plants. Additional validations on the call-off files previously to integration for BMW; Management of special orders in the sequencing process for TESLA; or implementation of SKODA’s call-off downloader for INOKOM providers are a few examples summarized in the news below.
Please, stay tuned for more news and updates.

Our best wishes.
Your GIMM Team.
PROCS EMEA-FRANCE-Henin Beaumont
Project to change the configuration on several workstations.
OEM: RENAULT

LINCS EMEA-SPAIN-Vitoria
Project to implement changes in the sequencing workflow of a selection of parts.
OEM: VOLKSWAGEN

PROCS EMEA-ITALY-Terni
Implementation of new stations in PROCS line producing for IVECO.
OEM: IVECO

PROCS EMEA-MOROCCO-Tanger
Project to upgrade PROCS version and to implement new line metrics configurations.
OEM: RSA

PROCS ASIA-CHINA-Shenyang
Project to modify the workflow of the line with regards to the print out of the the sequence labels. Additional validations on SYNCRO96ATP EDI file will also be included.
OEM: BMW Brilliance (BBA)

PROCS AMERICA-MEXICO-San Luis Potosi
Implementation of new workstations for the traceabiliy and control of parts produced and delivered to TESLA in Austin. The plant will configure the changes.
OEM: TESLA

PROCS AMERICA-MEXICO-Queretaro
Implementation of two new lines for the production control and traceability of parts for FORD C482.
OEM: FORD

PROCS EMEA-CZECH REPUBLIC-Pisek
Project to implement a new line in PROCS
OEM: STELLANTIS

LINCS ASIA-MALAYSIA-Penang
Project to install and configure the new MOS Downloader Connector for LeanERP calloff files from Inokom Sime Darby, a subsidiary of Porsche in Malaysia.
OEM: INOKOM

PROCS EMEA-CZECH REPUBLIC-Pardubice
Project to configure the temperature control operation to be done by a workstation that also performs the Visual Inspection operation.
OEM: BMW

PROCS EMEA-PORTUGAL-Palmela
Project to implement new workstations in the existing line.
OEM: VOLKSWAGEN

PROCS EMEA-FRANCE-Messei
Project to implement a new line in gIMM-PROCS for the traceability and control of parts for PSA.
OEM: PSA

PROCS ASIA-CHINA-Haining
Project to configure new workstations in a existing line in PROCS.
OEM: TESLA

PROCS EMEA-POLAND-Gorzow
Project to configure use case UC1289 for the plant's needs.This new functionality creates a report that shows the relation between raw materials ant the workstations which produces.
OEM: TESLA

PROCS ASIA-CHINA-Foshan
Configuration of new workstations in the existing line for VW276 parts.
OEM: VOLKSWAGEN

PROCS EMEA-PORTUGAL-Braganza
Project to implement a new line in gIMM-PROCS.
OEM: PSA

LINCS EMEA-GERMANY-Berlin
Project to adapt current LINCS implementation to Tesla's new request. The OEM will start to manage ad hoc orders that will be published with special "DeliverToLocation" information different from the regular JIS orders
OEM: TESLA

PROCS EMEA-SPAIN-Almussafes
Project to implement new validations for certain family components.
OEM: FORD

September 2021


Barcelona, month summary.

GIMM Solution growth is based in 3 main pillars. The first is our Customers’ needs, that might arise from standards and regulations, the OEMs demands or the Customer's internal necessities; the second pillar is the market trends aligned with T-Systems objectives; and the third but not least is our internal search for continuously improving our solutions robustness, user experience and systems management. You’ll be able to find many of these examples in previous news as well as in the use cases in the Download Center. Two of them are included in CU98, released on September 14th:

- Use case UC1260 aims to cover a European regulation for car manufacturers, which need to receive some traceability details from their suppliers. This use case creates a new interface that will allow the user to configure the content of 3 csv format files with the required information.

- Use case UC1255 provides solution for a new requirement from VW Group. The OEM requests their suppliers to send Baugruppen files by truck, that will include serial numbers from the components used to produce parts. A new interface has been created to generate the Baugruppen files of all the parts loaded in a selected truck.

All the new functionalities and bug fixes are accessible by our customers in the Customer Area .

In parallel, we keep working in the deployment of our solutions and their Support and Maintenance. A good example is the implementation of GIMM-PROCS in a new plant in Franklin (USA). After the deployment, PROCS will control the production and the traceability of parts that will be delivered to FORD Chicago. You will find this and many other projects in the list of our achievements this month.

Our best wishes.
GIMM Solutions team.
PROCS ASIA-INDIA-Pune
Project to implement changes in the workflow of the existing GIMM-PROCS installation.
OEM: CUMMINS

PROCS EMEA-CZECH REPUBLIC-Pisek
Implementation of new workstations inside a new flow. The changes will be self-configured by the customer.
OEM: VOLVO

LINCS EMEA-SPAIN-Vitoria
Project to implement exceptions based on the part types, in the workflow between the sequencing and the picking processes.
OEM: DAIMLER

PROCS EMEA-CZECH REPUBLIC-Mlada Boleslav
Project for the configuration of SAP MII API REST in the existing GIMM-PROCS installation.
OEM: SKODA

PROCS AMERICA-MEXICO-San Luis Potosi
Implementation of new workstations for the production control and traceability of part for vehicles P42Q y P42R.
OEM: NISSAN

PROCS EMEA-PORTUGAL-Braganza
Project for the configuration of additional workstations in the existing PROCS installation.
OEM: PSA

PROCS EMEA-SLOVAKIA-Hlohovec
Project to update PROCS current installation, adding new workstations and subsections.
OEM: VW Group

PROCS EMEA-ROMANIA-Arges
Project for the implementation of a new line in PROCS for the production control and traceability of parts for vehicle GLC254.
OEM: DAIMLER

LINCS EMEA-GERMANY-Celle
Project to update the ERP interface workflow.
OEM: DAIMLER

PROCS AMERICA-BRAZIL-Limeira
Project to implement PROCS for the production control and traceability of parts of truck SCANIA G390.
OEM: SCANIA

PROCS AMERICA-USA-Franklin
Project to implement PROCS in a new plant producing parts for FORD Chicago.
OEM: FORD

August 2021


Barcelona, month summary.

In GIMM, the engines never stop. During August many projects and new product developments are coming alive. Most of the projects are implementing changes or improvements to the existing production lines, but a few also create new lines for the traceability and production control of a new vehicle part.

A big LINCS-Sequencing implementation have occurred as well. LINCS started to manage the picking and sequencing operation of an OEM’S logistic provider in Argentina. Our solution replaces the provider's own solution. This allows the OEM to be independent from the logistic company that provides the service. The whole project has been executed remotely, with local teams on the infrastuctures side and post-golive support.

This summer is also bringing several product improvements. CU97 was released on August 6th, including new functionalities such as UC1232-Manage machine processes that have very long duration, UC1256-Generate ASN files for Lamborghini including a free text entered from the Cargo Management Screen and UC1273 – New autopacking workstation. All the content of this cumulative update and others are available at the Customer Area .

We wish you a warm welcome to the new season.

GIMM Solutions team.
PROCS EMEA-FRANCE-Bavans
Implementation of new workstations for the production control of Fuel Cell tanks.The changes will be configured by the customer.
OEM: PSA

PROCS AMERICA-MEXICO-Queretaro
Project to implement a new workflow on the production control for GM LT4. The changes will be configured by the customer.
OEM: GM

PROCS EMEA-POLAND-Gorzow
Project to implement new workstations for the production control of parts for vehicle Daimler GLC XC254.
OEM: DAIMLER

PROCS AMERICA-MEXICO-San Luis Potosi
Project to implement a new line for the traceability and control of parts for GM tracks synergy. The new workstations will be configured by the customer.
OEM: GM

PROCS EMEA-NETHERLANDS-Roermond
Project to add new workstations for the production control and traceability of parts for vehicle DAF truck MY21.
OEM: SCANIA

July 2021


Barcelona, month summary.

Automotive industry is the most known example of Mass Customization, combining the personalization and flexibility of custom-made products with mass production. At the manufacturing level, Mass Customization takes independent modules and customizes them into different functionalities that suit the user’s preference. Modules are usually produced by different suppliers which factories equipment and robots, controlled by computers, are configured to readjust the production. A big part of our projects reflects these readjustments by adding new workstations and references (modules), adding lines or changing the lines workflow. You’ll be able to see some of these cases in our news this month.

CU96 was released at the beginning of the month including a new configuration option in PROCS SAP interface added to declare backflushes. Please remember that all Cummulative Updates (CU’s) of our solutions can be downloaded at the Customer Area .

We wish you all a safe and restful summer.
GIMM Solutions team.
PROCS EMEA-FRANCE-Theillay
Project to implement a new line in gIMM-PROCS for traceability and production control of new parts.
OEM: RENAULT

PROCS EMEA-PORTUGAL-Braganza
Project to add new work stations on the existing gIMM-PROCS system. The customer will configure the changes.
OEM: PSA

SYNCHRON AMERICA-USA-Newark
Project to migrate MOS connector with TESLA for its evolution,named MFS.
OEM: TESLA

LINCS ASIA-MALAYSIA-Penang
Project for the creation of two interfaces with the plant's internal systems.
OEM: INOKOM

PROCS EMEA-ITALY-Terni
Project to add new work stations on the existing gIMM-PROCS system. The customer will configure the changes.
OEM: MASERATI

PROCS EMEA-FRANCE-Sochaux
Project to add new work stations on the existing gIMM-PROCS system.
OEM: PSA

LINCS EMEA-SPAIN-Sant Andreu de la Barca
Project to implement new interfaces for Business Intelligence analytics.
OEM: PORSCHE

PROCS EMEA-NETHERLANDS-Roermond
Project to implement a new line with gIMM-PROCS for the traceability and production control of parts for DAF trucks.
OEM: DAF

PROCS ASIA-INDIA-Pune
Project to add new work stations on the existing gIMM-PROCS system.
OEM: CUMMINS

PROCS EMEA-PORTUGAL-Palmela
Project to add new work stations on the existing gIMM-PROCS system.
OEM: VOLKSWAGEN

PROCS EMEA-CZECH REPUBLIC-Mlada Boleslav
New GIMM PROCS installation for the traceability and production control of parts for BMW U1 series.
OEM: BMW

LINCS EMEA-SLOVAKIA-Lozorno
Project to configure a new interface that will generate Baugruppen files by truck.
OEM: VOLKSWAGEN

PROCS EMEA-MOROCCO-Kenitra
Project to add new workstations on the existing gIMM-PROCS system.
OEM: PSA

PROCS EMEA-FRANCE-Henin Beaumont
Project for the configuration of the PLC Status Alerts in gIMM-PROCS system.
OEM: RENAULT

PROCS EMEA-POLAND-Gorzow
Project to include new PROCS workstations in the existing line producing parts for vehicle Daimler GLC.
OEM: DAIMLER

PROCS EMEA-GERMANY-Augsburg
Project to add a new workflow and new work stations on the existing gIMM-PROCS system. The changes will be configured by the customer.
OEM: DAIMLER

LINCS AMERICA-ARGENTINA-Argentina
Project to implement a JIT/JIS system using gIMM-LINCS for the delivery of parts in sequence to VW factory in Pacheco.
OEM: VOLKSWAGEN

PROCS EMEA-SPAIN-Abrera
Project to modify gIMM-PROCS configuration in order to substitute the manual packing workstations for automatic ones.
OEM: SEAT

June 2021


Barcelona, month summary.

A cornerstone of Industry 4.0 is the interconnexion between different production items (horizontal integration), and these in turn with the factory's information systems (vertical integration). Horizontal Integration ensures that machinery and engineering processes work together seamlessly, while Vertical Integration makes production data available for decision making purposes, at all company levels. GIMM provides flexible solutions for connecting with external devices and software applications, which are commonly implemented in our projects. One example of this, is a project we are working on this month for the integration of LINCS and PROCS with a KARDEX warehousing solution.

Additionally, we have updated our product with three new functionalities. These improvements consists on an adaptation in the container label to highlight it with an error message when there is a sequence jump in it, to show a new status (Non-traceability PLC) in the workstations Monitoring Screen and to add the OEM Sequence Number into a segment of the SAP interface. These functionalities and several bug fixes are included in CU94 and CU95. Visit Customer Area for downloads.

Our best wishes.
GIMM Solutions team.
LINCS EMEA-SPAIN-Martorell
Project to adapt the plant's sequencing system to visualize the material stock delivered in a web application .
OEM: SEAT

PROCS EMEA-FRANCE-Theillay
Project to modify the line workflow for vehicle Megane
OEM: RENAULT

SYNCHRON EMEA-FRANCE-Vernon
Project to migrate the communication application from SYNCIP to Corail to adapt to PSA Poissy requirements
OEM: PSA

LINCS EMEA-POLAND-Tulipan
Project to implement LINCS sequencing system for the delivery of parts to OPEL facilities in Gliwice. Synchron for Corail V2 will also be installed and configured in order to download the files from the OEM.
OEM: OPEL

PROCS EMEA-FRANCE-Sochaux
Project to implement new workstations on current GIMM-PROCS system.
OEM: PSA

PROCS ASIA-CHINA-Shenyang
Project to implement a new line for sequencing, production control and traceability of parts of BMW U12IP.
OEM: BMW Brilliance (BBA)

PROCS AMERICA-MEXICO-San Luis Potosi
Customer self implementation of new workstations on the existing GIMM-PROCS production control system.
OEM: GM

PROCS AMERICA-MEXICO-San Jose Iturbide
Project to implement new workstations on current GIMM-PROCS system. The changes will be configured by the customer.
OEM: FORD

LINCS EMEA-FRANCE-Saint Desirat
Project to add new poka-yoke controls depending on the part family.
OEM: RENAULT TRUCKS

PROCS EMEA-NETHERLANDS-Roermond
Project to implement a new line in the existing GIMM-PROCS system.
OEM: DAF

PROCS EMEA-CZECH REPUBLIC-Mlada Boleslav
Implementation of new workstations on the existing control and traceability system.
OEM: VW GROUP

LINCS EMEA-SLOVAKIA-Lozorno
Project to implement a new sequencing flow for the production and delivery of parts to Skoda CZ.
OEM: SKODA

LINCS EMEA-SLOVAKIA-Lozorno
Project to adapt ASN truck file for Lamborghini plant in Bolognia.
OEM: LAMBORGHINI

PROCS EMEA-SLOVAKIA-Kosice
Project to implement the traceability and production control system of a new line producing parts for Porsche Cayenne PO536IP
OEM: PORSCHE

LINCS EMEA-GERMANY-Kandel
Project to configure the generation of a new warning email in certain cases.
OEM: DAIMLER

LINCS EMEA-FRANCE-Hordain
Project to configure LINCS new interfaces with PES ERP and a new poka-yoke for the Container validation station.
OEM: PSA

PROCS EMEA-POLAND-Gorzow
Project to implement a new line for the production control and traceability of vehicle Mercedes GLC X254.
OEM: DAIMLER

PROCS EMEA-TURKEY-Golcuk
Project for the implementation of a new vehicle project in the existing GIMM-PROCS system.
OEM: FORD

LINCS EMEA-GERMANY-Celle
Project to adapt the sequencing flow of Hall 9 line in accordance with the new requirements from Mercedes Bremen.
OEM: DAIMLER

LINCS, PROCS EMEA-SPAIN-Arevalo
Project to implement an interface between LINCS-PROCS and KARDEX storage solution. For each OEM’s call-off, the system will ask KARDEX for the kitting of components and then will generate the order for its subsequent production.
OEM: PSA

PROCS EMEA-SPAIN-Almussafes
Customer self- implementation of new work stations.
OEM: FORD

May 2021


Barcelona, month summary.

Poka-Yoke is one important feature present in all GIMM solutions. This working strategy developed by Toyota in the 1960s, is applied nowadays in many logistics and production processes to simplify the operators work while significantly reducing the defects and speeding up the picking process. Poka-Yoke practices and technologies are chosen in accordance with the plant’s processes and automation level. This month we are working on projects with several of these solutions, from a basic ECS (Expedition Control System) with a manual barcode reader, pick-to-light and kitting systems and even RFID tunnels for automatic validations.

Other projects this month also aim to implement continuous improvement techniques by configuring different dashboards that will allow the plant to anticipate to changes or problems in their production and/or sequencing processes.

On the side of GIMM product developments, CU093 was released in May including 2 new functionalities, one for the creation of a Custom Shipment external interface and the other to change JitEvents interface making configurable the padding of the segment E1PRSQ. Visit Customer Area for downloads.

Our best wishes.
GIMM Solutions team.
LINCS EMEA-SPAIN-Vitoria
Project to make adaptations to the visualization and printing of the smooth production process of the plant.
OEM: VOLKSWAGEN

RVSEVO EMEA-SPAIN-Vitoria
Project to configure rvsEVO to connect the plant with VW Emden.
OEM: VOLKSWAGEN

PROCS EMEA-ITALY-Terni
Implementation of a new line for the production control and traceability of new parts for MASERATI. The changes will be configured by the customer. The plant will also implement a new project for the production control of parts for IVECO trucks.
OEM: MASERATI, IVECO

LINCS EMEA-SPAIN-Sant Andreu de la Barca
Project to develop a new interface between LINCS and the plant's RFID system. The system will automatically perform the validations on the containers that pass through the RFID tunnel.
The plant is also enabling the kitting process for vehicle SE216 PA.
OEM: SEAT

LINCS EMEA-FRANCE-Poissy
Project to migrate the EDI exchange protocol from SYNCIP to CORAIL. Additionally the plant will implement an interface between GIMM-LINCS sequencing system and the ERP in place in the plant, PES. The project will also adapt its ECS validation workflow to include additional poka-yoke ckecks that will take into account the information received from the ERP and then confirm to the ERP which parts were validated.
OEM: PSA

PROCS EMEA-CZECH REPUBLIC-Pisek
Project to implement a new flow and new workstations on existing PROCS system.
OEM: VOLVO

LINCS EMEA-SPAIN-Orkoien
Project to configure LINCS UI dashboard in the existing LINCS system in the plant. The dashboard will show the general sequencing status and the status for each part family that is sequenced. Additionally the plant will implement LINCS Alert System through SMS and email.
OEM: SEAT

PROCS EMEA-TURKEY-Orhangazi
Project to add new workstations to existing PROCS system.
OEM: RENAULT

LINCS EMEA-SPAIN-Martorell
Project to implement a dashboard and several visualization screens to provide the plant with stock information and term coverage based on the current demand.
OEM: SEAT

PROCS EMEA-SLOVAKIA-Kosice
Project to implement a new line in the existing PROCS system.
OEM: DAIMLER

PROCS EMEA-POLAND-Gorzow
Project to configure a new traceability and control system for Mercedes Benz GLC model.
OEM: DAIMLER

PROCS AMERICA-USA-Columbus
Implementation of a new subsection in the existing production control and traceability process.
OEM: JOHN DEERE

LINCS EMEA-SPAIN-Arevalo
Project for the implementation of an interface between LINCS-PROCS Kitting functionality and the Pick to Light system of the plant.
OEM: PSA

PROCS LINCS EMEA-SPAIN-Almussafes
Project to add new workstations to the existing production control and traceability process. The changes in PROCS will be implemented by the customer.
In addition, a watermark will be implemented on the container label for certain cases of the sequencing process.
OEM: FORD

April 2021


Barcelona, month summary.

This month, amongst many others, we have a new project to implement Webpicking. This software is able to show Picking lists in a web application with the materials that an Operator must bring to the assembly lines, with no waste of paper for this task. The web application can be accessed by a browser installed in multiple devices, such as PCs, mobiles, iPads or Android tablets. The Kitting shows in which position of the picking repository should each material be placed. It also has a visual aid that can include a picture of the part and the location in the storage area.
The implementation of Webpicking results in multiple benefits for the plant such as optimization and reduction of displacement times, human error reduction and Fast training of operators, and at the same time is highly scalable and doesn’t need any hardware or software installation.

We have also released GIMM 4.0 CU92. This cumulative update solves some bug fixes and, as usually can be downloaded from the Customer Area .

Stay safe.
EMEA-ITALY-Terni
Project for the implementation of a new flow with an additional station for MASERATI - M182 and M240 line on gIMM-PROCS system. The changes will be self-configured by the customer.
OEM: MASERATI

WEBPICKING AMERICA-USA-Spring Hill
Project for the installation of a gIMM-WebPicking system on the existing BMW G09 line.
gIMM-WebPicking will work in Native Mode by running as an integrated module of gIMM system, that is, picking orders created on gIMM system with the integration of call-offs using the gIMM-LINCS module.
OEM: BMW

SYNCHRON ASIA-CHINA-Shangai
Project to adapt Tesla MOS connector to update the headers in all calls as requested by the OEM.
OEM: TESLA

LINCS EMEA-SPAIN-Sant Andreu de la Barca
Project to set up an external interface in LINCS JIS system.
OEM: SEAT

PROCS AMERICA-MEXICO-San Luis Potosi
Project for the implementation of new workstations on Tesla line with gIMM-PROCS. The changes will be configured by the customer.
OEM: GM

PROCS EMEA-NETHERLANDS-Roermond
Project for the implementation of a new line on gIMM-PROCS system.
OEM: SCANIA

PROCS AMERICA-MEXICO-Queretaro
Project for the implementation of new workstations on the existing line in gIMM-PROCS. The changes will be self-configured by the customer.
OEM: GM

PROCS EMEA-GERMANY-Peine
Project for the implementation of a new line on existing gIMM-PROCS system
OEM: VW

PROCS EMEA-CZECH REPUBLIC-Pardubice
Project for the configuration of additional workstations and to implement changes on the existing lines with gIMM-PROCS system.
OEM: BMW, TOYOTA

PROCS EMEA-TURKEY-Orghangazi
Project to add and modify several workstations to a existing line in gIMM-PROCS
OEM: RENAULT

PROCS EMEA-CZECH REPUBLIC-Mlada Boleslav
Project for the implementation of a new flow with an additional station for Audi line on gIMM-PROCS system
OEM: AUDI

PROCS EMEA-SLOVAKIA-Hlohovec
Implementation of a new line in gIMM-PROCS.
OEM: SKODA

PROCS EMEA-POLAND-Gorzow
Project for the configuration of a new line with gIMM-PROCS system for the production of parts for TESLA MY in Berlin.
OEM: TESLA

PROCS ASIA-CHINA-Dongguan
Project to implement new Workstations and new references on existing line in gIMM-PROCS system
OEM: BYTON

PROCS EMEA-FRANCE-Bavans
Implementation of a new line in gIMM-PROCS.

PROCS EMEA-ROMANIA-Arges
Project to add new references to an existing line and, in consequence, adapt the workstations and the production routes that these references require.
OEM: FORD

PROCS EMEA-SPAIN-Almussafes
Project to add new workstations on existing line in gIMM-PROCS system.
OEM: FORD

PROCS EMEA-SPAIN-Abrera
Project to configure new workstations on the existing line in gIMM-PROCS system.
OEM: SEAT

March 2021


Barcelona, month summary.

GIMM will be implemented again in Argentina. Our Just in Sequence solution, LINCS, has been selected for the sequence delivery of ten family parts to VOLKSWAGEN in Pacheco. Far away from there, PROCS will start managing the production of some parts for Ferrari at Maranello (Italy) and for BMW-Brilliance, the joint venture that produces, distributes and sales BMW passenger cars in mainland China. These are only a few of our coming projects that you will find below.

Seven new functionalities are also available at the Customer Area from March, as for example the possibility to apply different trascodification rules depending on the OEM Point and the inclusion of the SCS device ID in the traceability data.

Please stay safe. We wish you and your families the best.
LINCS AMERICA-ARGENTINA-Pacheco
Project to implement a JIS system for the OEM's supplier in order to deliver up to 10 family parts to the car factory of VW in Pachecho. The system will include the container and truck management and quality assuarance processes, as well as several external interfaces.
OEM: VW

LINCS AMERICA-USA-Newark
Project to modify the current sequencing process in order to balance the production depending on which OEM's line the part will be delivered.
OEM: TESLA

LINCS EMEA-SPAIN-Vigo
Project to adapt the plant's ANDON Board to the new plant requirements.
OEM: PSA

LINCS EMEA-FRANCE-Pfastatt
Project to change the current ECS container validation in order to include the conformity process and traceability information for externally produced parts.
OEM: PSA

PROCS AMERICA-USA-Spring Hill
New projects for the production traceability and control of parts produced for several vehicles for BMW G09 program and GM.
OEM: BMW, GM

PROCS ASIA-CHINA-Shenyang
Project to configure GIMM system for the production control of several parts supplied for the new vehicle FAAR WE. The system will also be adapted to switch the process depending on the part type requested by the OEM.

Additionally, new functionalities in CSV integration, a new external interface generation and other small improvements will be implemented.
OEM: BMW-Brilliance

PROCS AMERICA-MEXICO-Queretaro
Project to configure new references and their workflow for the production control of a new vehicle variant. The changes will be configured by the customer.
OEM: GM

PROCS EMEA-CZECH REPUBLIC-Pardubice
Project to configure additional Cooling workstations in the current production system.
OEM: BMW

PROCS EMEA-HUNGARY-Jaszarokszallas
Project to add new workstations to the production traceability and control system of several parts for Ferrari F171 .
OEM: FERRARI

PROCS EMEA-SOUTH AFRICA-Cape Town
Project to add new workstations and to modify others in the current production control and traceability system of the plant.
OEM: FORD

PROCS EMEA-PORTUGAL-Braganza
Project to add new workstations to the current production control and traceability system at the supplier's plant.
OEM: PSA

PROCS ASIA-INDIA-Ammavaru Palli
Project to change the production traceability configuration of a part produced for KIA SP2I vehicle.
OEM: KIA

PROCS EMEA-SPAIN-Almussafes
Project to add the SCS device ID used for container or truck validation, to the traceability information.
OEM: Ford

February 2021


Barcelona, month summary.

We are very happy to keep expanding the number of customers that find in our Product suit the solutions that will help them grow in the Industry 4.0. One of these new implementations will also take GIMM to a new country, Malasia. A warm welcome to CEFA, Rhenus and Clarion.

A big variety of projects have arrived during February. New implementations of Synchron, this time for EDI exchange with Opel Figueruelas; projects to adapt LINCS for particular OEM situations or to implement improvements for the plant itself, as automations by integrating our systems with the plant’s ERP; and of course, new installations and extensions of the current production and sequencing systems.

We have also released WebCore, the new framework to manage the communication and visualization between Expedition and Shipping Control Systems (ECS/SCS) and the shopfloor devices. New projects implementing ECS/SCS will benefit from WebCore. Read new in LinkedIn.

Our best wishes for you and your families.
PROCS EMEA-SPAIN-Tarazona
Project for the configuration of new final references in current PROCS system.
OEM: RENAULT

PROCS ASIA-THAILAND-Rayong
Implementation of two new lines producing for FORD in current PROCS system.
OEM: FORD

PROCS EMEA-CZECH REPUBLIC-Pardubice
Project for the configuration of additional workstations in current PROCS system.
OEM: BMW

PROCS EMEA-PORTUGAL-Palmela
Project to implement the automatic integration of Masterdata from the plant's ERP, instead of manual configuration.
OEM: VW GROUP

PROCS EMEA-CZECH REPUBLIC-Mlada Boleslav
Project to configure current PROCS system for controlling additional workstations.
OEM: AUDI

PROCS EMEA-SLOVAKIA-Lozorno
Project to adapt SCS validation process to check some parts that are not produced in the plant but are sequenced.
OEM: VW GROUP

PROCS EMEA-PORTUGAL-Braganza
Project to configure additional workstations and to add a new line on gIMM PROCS current system
OEM: PSA

PROCS ASIA-CHINA-Beijing
Project for the configuration of additional workstations for Cummins SCR&DOC L3 line
OEM: CUMMINS

LINCS ASIA-MALAYSIA-Penang
Project to implement a LINCS JIT/JIS system that will sequence several parts for PAG Cayenne E3 car model to Inokom in Kedah (Malaysia).
OEM: INOKOM

SYNCHRON EMEA-SPAIN-Figueruelas
Projects for the implementation of SYNCHRON in two first-tier suppliers of PSA Group in Zaragoza. SYNCHRON system is an additional feature of T-Systems’ gIMM Suit that enables communication with PSA web service. It is responsible downloading PSA JIT/JIS messages as long range signals.
OEM: OPEL

LINCS EMEA-SLOVAKIA-Trnava
Project to configure LINCS interfaces with the plant's ERP and to implement an additional container shipment control depending on the data existing on the ERP.
OEM: PSA

LINCS EMEA-FRANCE-Vernon
Project to set up a new process for sending emails to the OEM with every shipment of a truck.
OEM: RSA

LINCS EMEA-SLOVAKIA-Hlohovec
Project to automatically recover LINCS system from a sequence jump when the missing sequence arrives, even if its process date is older than the jumped.
OEM: JLR

LINCS EMEA-FRANCE-Guichen
PSA Rennes has changed the way the parts for C84 models are requested from Final Reference to Modular. This project aim to change the trascodification and labels printing processes for the sequencing of these parts.
OEM: PSA

PROCS & LINCS EMEA-SPAIN-Arevalo
Project to include small changes in the production control and traceability system and to adapt the long range sequencing process to manage the delivery of out-of sequence parts.
OEM: PSA

January 2021


Barcelona, month summary.

We start a new year that is still full of uncertainty. Nevertheless these are times for transformation and growth in every aspect of our lives. GIMM Team is fully committed with this new future finding new ways of doing, being Agile and most of all listening and adapting to our customers’ needs to move forward together. Best wishes for 2021.

Our projects in January will adapt current GIMM installations to the new requirements of the plants’ production and sequencing processes. Two of them aim to implement Synchron. The supply process for production material, spare parts, and stocked general material is commonly supported by EDI (Electronic Data Interchange). Synchron is our module for electronic data interchange between OEM’s plants and their suppliers. It compiles several solutions for connecting to PSA, RSA, TESLA and most recently to FORD NGAVS/EBC that is being implemented globally in Ford’s vehicle assembly plants.

We have also released GIMM 4.0 CU88. This cumulative update solves some bug fixes and, as usually can be downloaded from the Customer Area .

We hope all of you and your loved ones are healthy and safe.
EMEA-POLAND-BIERUN
Project to install and configure gIMM SYNCHRON. The system will be in charge of downloading EDI files from PSA Corail Servers (Stack, Track and Pre-Invoice).
OEM: OPEL

EMEA-SOUTH AFRICA-Cape Town
Project for the configuration of gIMM's interface for the upload and material transfer to SAP MII via API REST.
OEM: FORD

EMEA-ITALY-Terni
Project to configure new workstations in current GIMM-PROCS system. The changes will be configured by the customer.
OEM: MASERATI

AMERICA-MEXICO-San Luis Potosi
Project to configure new workstations in current GIMM-PROCS system. The changes will be configured by the customer.
OEM: TESLA

EMEA-CZECH REPUBLIC-Pisek
Project for the configuration of gIMM interface for the containers information upload to SAP MII via API REST. The project also includes the addition of new workstations to the line.
OEM: VOLVO

EMEA-CZECH REPUBLIC-Pardubice
Project to add new workstations on current GIMM-PROCS system.
OEM: BMW

EMEA-PORTUGAL-Palmela
Project to implement a new GIMM-PROCS system for the production control and traceability of parts that will be delivered to VW Palmela.
OEM: VOLKSWAGEN

EMEA-SLOVAKIA-Kosice
Project to configure new workstations in current GIMM system
OEM: MERCEDES BENZ

EMEA-PORTUGAL-Braganza
Project for the configuration of gIMM interface for the production upload and material transfer to SAP MII via API REST.
OEM: PSA

EMEA-FRANCE-Auchel
Project to add exceptions for the production control and traceability of certain parts.
OEM: MERCEDES BENZ

EMEA-SPAIN-Almussafes
Project for the implementation of SYNCHRON system that will receive EDI exchanges from FORD Almussafes (Spain). SYNCHRON manages the downloading of call-off files from FORD'S NGAVS/EBC module.
OEM: FORD